Characteristics of construction project
What are the 5 characteristics of a project?
- i. Specific. The project must be specific. …
- ii. Measurable. A clearly defined project must be measurable in terms of its benefits and achievements. …
- iii. Achievable. A project will only be meaningful if it is achievable. …
- iv. Relevant. The project needs to bring relevant benefits to the entity concerned. …
- v. Time bound.
What are the characteristics of construction management?
8 Qualities to Look for In a Construction Project Manager
- Ability to Work as a Team Member. …
- Organizational Skills. …
- Effective Communication Skills. …
- Ability to Delegate Tasks. …
- Ability to Stay Calm Under Pressure. …
- Problem Solving Skills. …
- Flexibility. …
- Ability to Prioritize.
Which three are characteristics of a project?
Six Characteristics of a Project
A project is typically for a customer. The project is temporary in nature. It typically has a defined start and a defined end-point. The project will have a unique set of requirements that need to be delivered within the boundaries of this project.
What are the types of construction project?
Types of Construction Projects
- Residential Construction Projects. Residential construction projects include new construction and remodeling/renovation of existing homes. …
- Commercial Construction. …
- Industrial Construction Projects. …
- Institutional Construction Projects. …
- Infrastructure Construction. …
- Environmental Projects.
What defines a construction project?
A construction project, sometimes just referred to as a ‘project’, is the organised process of constructing, renovating, refurbishing, etc. a building, structure or infrastructure.
What is project and its characteristics?
A project creates something new – Every project is unique, producing something that did not previously exist. A project is a one-time, once-off activity, never to be repeated exactly the same way again. A project has boundaries – A project operates within certain constraints of time, money, quality, and functionality.
What is a project definition and key characteristics?
A project can be considered to be any series of activities and tasks that: (a) Have a specific objective to be completed within certain specifications; (b) Have defined start and end dates; (c) Have funding limits (if applicable) and. (d) Consume resources (i.e. money, time, equipment).
What is the main function of construction management?
The purpose of Construction management is to control a project’s time / delivery, cost and quality—sometimes referred to as a project management triangle or “triple constraints.” CM is compatible with all project delivery systems, including design-bid-build, design-build, CM At-Risk and Public Private Partnerships.
What are the four main elements to the construction management process?
4 Essential Phases of the Construction Process
- Planning Phase. Planning, the first phase of any major project is the process of articulating and defining the goals for the project and evaluating the feasibility of the plan. …
- Preconstruction Phase. …
- Construction Phase. …
- Close-Out Phase.
What are the principles of construction management?
The Five Construction Principles have been established so that the five elements: environmental protection, safety, speed, economy, and aesthetics, conform with a balanced regular pentagon.
What is the 4 functions of the construction manager during the pre-construction phase?
Pre-Construction Phase
The pre-construction phase includes creating a strategic plan for the project, creating a design, securing permits or entitlements, and gathering the labor and resources required for construction.
What are the 5 stages of construction project?
The five phases of the construction project lifecycle are:
- Project Initiation and Conception. Like with all things, the first step to the construction life cycle is merely to begin. …
- Project Planning and Definition. …
- Project Execution and Launch. …
- Project Performance. …
- Project Close.
What are the 7 stages of construction?
Here’s the process:
- Step 1: Design. During this phase, the client places a project for bidding. …
- Step 2: Pre-Construction. …
- Step 3: Procurement. …
- Step 4: Construction. …
- Step 5: Commissioning. …
- Step 6: Owner Occupancy. …
- Step 7: Project Closeout.